Quality Center

Process Control

  • We control our process based on a control plan which start from the material receiving passing through the production processes ending with the casting tests.
  • Raw material warehouse releasing the needed materials for the production every shift based on the bill of material. 
  • Released materials from the warehouse stored on the melting platform beside the furnaces.

Quality Control

Green Sand Laboratory

  • Moisture test.

  • Green compression test.

  • Permeability test.

  • Active Clay test.

  • Compactability test.

  • LOI test.

  • Total fines test.

Metal Laboratory

  • Chemical composition analysis using  spectrometer device.

  • Microstructure test.

  • Hardness test

  • Tensile & Elongation test (outsourcing)