ISO 9001:2015 CERTIFIED

Quality is Not an Act.
It's Our Process

From raw material inspection to final load testing, every casting passes through 3 dedicated laboratories and strict process controls. Zero defects. Full traceability.

3
In-House Labs
100%
Batch Tested
EN 124
Standard Compliant
Quality Control Lab
Spectrometer Analysis
Load Test Certificate
PROCESS CONTROL

Controlled From Start
To Finish

Strict process control from raw material to final inspection. Every step documented, every batch traceable.

01

Control Plan

We control our process based on a control plan which starts from material receiving, passing through production processes, ending with casting tests.

02

Raw Material Warehouse

Released materials from warehouse stored on melting platform beside furnaces. Every shift releases needed materials based on bill of material.

03

Full Traceability

Every batch tracked from raw material to final product. Heat numbers, test certificates, and inspection records maintained for complete traceability.

QUALITY CONTROL

Tested & Certified

3 dedicated laboratories. Complete control from sand properties to final mechanical testing and load verification.

Green Sand Lab
SAND CONTROL
Sand Test
01

Green Sand Laboratory

Complete sand property testing to ensure consistent mold quality and defect-free castings. Testing performed every shift.

Moisture Test%H₂O Control
Green Compression TestStrength PSI
Permeability TestGas Flow Rate
Active Clay TestMB Clay %
Compact Ability Test% Compact
Loss of Ignition LOIOrganic Content
Total Fines Test% < 100 Mesh
02

Metal Laboratory

Chemical and physical properties testing. In-house spectrometer and microstructure analysis, tensile testing through certified external lab.

Chemical CompositionOES Spectrometer Device
Microstructure TestMetallurgical Microscope
Hardness TestHB, HRC, HV
Tensile & ElongationOutsourced Certified Lab
Metal Lab
ISO 17025
Metal Tests
Load Test
LOAD TEST
Testing
03
FINAL VERIFICATION

Load Test Machine

Destructive and proof load testing for critical components. Final safety verification before shipment according to customer specifications and standards.

Test TypeDestructive / Proof Load
ApplicationManhole Covers & Frames
StandardEN 124 / Customer Spec
ReportingTest Certificate Issued
PurposeSafety & Compliance

Need Certified Castings
For Your Project?

Talk to our quality engineers. We'll review your specs and provide test certificates before production starts.